Technical data
Client: Qatar Railways
Location: Doha, Qatar
Project: Ventilation System (TVS)
Year: 2016-2019
Descripción del proyecto
The design works commenced in 2016 with the aim to be operational by the end of 2019. We developed the entire EPC for the cooling system for the metro tunnels.
The main objective of the project was to obtain low temperatures inside the tunnel in order to obtain an excellent HVAC performance in all trains and tunnels, as well as to ensure a safe evacuation in case of emergency.
i-lanza has developed the integration of the cooling system with the tunnel ventilation systems (TVS) by installing AHUs in 83 rooms with a total installed cooling capacity of 66,400KW.