Technical Data
Client: OHL
Location: Antioquia, Colombia
Project: HVAC system
Year: 2019
Descripción del proyecto
Project in which i-lanza carried out the supply, installation and commissioning works for the complete HVAC system of the ‘PROYECTO TORRE’, a cement plant located in the district of Sonsón, department of Antioquia (Colombia), with a capacity of approximately 3,150 t/day of clinker and 1.5 million t/year.
The system was designed for conditions of 32ºC and 85% R.H., guaranteeing an optimum interior temperature/humidity in all the electrical substations, transformer rooms, compressor rooms and other technical buildings of the cement plant.