Reference works

Ain Beni Mathar-Marruecos

Ain Beni Mathar, Morocco

Project for an Integrated Thermo Solar Combined Cycle Power Plant in which I-lanza realized all the HVAC engineering and implementation, delivering the customer a turnkey with a thermal power installed of more than 1 MW. I-lanza, once finished the work, maintained its commitment to customer by performing all the maintenance works.

Shams I-Abu-Dhabi

Shams Abu-Dhabi-I

Project for a Thermo Solar Central located in a super-extreme atmosphere ( 52 °C/100% RH) in which I-lanza carried out all the HVAC engineering and implementation delivering the customer a turnkey installation with a thermal power installed of more than 1,5 MW. In this project are included specific air treatment procedures in extreme conditions., developing an R&D+I exclusive for this HVAC project. Once finished the installation, we maintain our commitment to customer performing all the maintenance works.

Obras de Polonia

Stalowa Wola-Polonia

Project of district heating in which I-lanza realized all the HVAC engineering and implementation, delivering the customer a turnkey with a thermal power installed of more than 2 MW. . In this project are included development procedures of lines and steam boilers with energy recovery.

HC Soto de Ribera

Soto de Ribera IV/V-Spain

Project for a gas-steam combined cycle in which I-lanza carried out all HVAC engineering and implementation, delivering the customer a turnkey installation with a thermal power installed over 400 kW. Once finished the installation, we maintain our commitment to customer performing all the maintenance works.

3D Carrington Reino Unido

C.C. Carrington-United Kingdom

Project in which I-lanza realizes all the engineering related to HVAC system. For this project we are developing an R&D+I of specific 3D design for HVAC systems integrated in EPC plants. I-lanza, with this method became the first Spanish company in their field in use this type of engineering works.

Obra TSK

TSK Headquarters building-Spain (Gijon)

HVAC Project for one of the leading companies in the region. TSK selected I-lanza, as a leader company in the sector, to realize the HVAC in their headquarters. Once finished the installation, we maintain our commitment to customer performing all the maintenance works.

Restaurante AgU Alejandro Urrutia

Restaurant AgU-Spain (Gijón)

I-lanza in our line of residential and restoration works have carried out the air conditioning project in this place. This project stands out for its execution complexity because the restaurant is located in an old building in the center of Gijón and it has specific architecture for the HVAC installation. In addition, the project also stands out because the requeriments in the design from the customer, a Spanish cook champion with Michelin Stars.

Kaxu Solar One - Sudáfrica

Kaxu Solar One – South Africa

Project for CSP Solar Thermal Power Plant in which I-lanza realized all the HVAC engineering and implementation, delivering the customer a turnkey project with a thermal power installed of more than 600 kW. The development of this project was in an area with ​​exceptional conditions such as the Kalahari Desert.

Argelia

Dead Sea-Israel

Project of gas-steam combined cycle in which I-lanza realized all HVAC engineering and implementation, delivering the customer a turnkey project with a thermal power installed of more than 1,5 MW. This project has been carried out in the deepest land area location of the planet with particularly abrasive conditions. Project co-financed by the Government of the Principality of Asturias through IDEPA as well as the European Union through the FEDER.

Nuevo Pemex Mexico

Nuevo Pemex-Mexico

Project of cogeneration in which I-lanza realized all HVAC engineering and implementation, delivering the customer a turnkey project with a thermal power installed of more than 1,2 MW.

Panahíba-Brasil

Parnaiba-Brasil

Project of open cycles in which I-lanza realized all HVAC engineering and implementation, delivering the customer a turnkey project with a thermal power installed over 500 MW.